the New TKTS moves at a snails pace
#1the New TKTS moves at a snails pace
Posted: 6/1/07 at 10:11am
TKTS Booth Construction Moves at a Snail's Pace
#2re: the New TKTS moves at a snails pace
Posted: 6/1/07 at 11:24amWhen they first closed it down last year, it was reported it'll be open in time for the big christmas crowds this year. Doesn't seem like it'll happen.
#2re: the New TKTS moves at a snails pace
Posted: 6/1/07 at 11:41amWith all due respect, it looks almost done. You don't "skin" a new building like that with a logo unless you're fairly close. Sure, there is interior work and technology installation that needs to be finished, but it "could" be open by the holidays. The surrounding area also looks to be it's ready for final grading -- not a lot of construction machinery needs to be moved.
#3re: the New TKTS moves at a snails pace
Posted: 6/1/07 at 11:54amWho cares? The line underneath the Marquis is much better, anyway. I say take your time.
#4re: the New TKTS moves at a snails pace
Posted: 6/1/07 at 11:56am
"The Duffy Square/TKTS booth renovation and construction project will begin in May. The aim is a new Duffy Square booth by early winter (late 2006)."
Excuse me but the target date was winter 2006 - 6 months AGO. It takes less time to build a skyscraper in Manhattan than it has to do reconstruction on TKTS and Duffy Square.
#5re: the New TKTS moves at a snails pace
Posted: 6/1/07 at 11:57amI agree that the line under the Marquis is better than the way it was before. I say keep it like that.
-Kad
"I have also met him in person, and I find him to be quite funny actually. Arrogant and often misinformed, but still funny."
-bjh2114 (on Michael Riedel)
#6re: the New TKTS moves at a snails pace
Posted: 6/1/07 at 10:42pmI work at Lion King and I have a perfect view of Duffy Sqaure and since I have worked there (Since November) I have rarely seen anyone working on it. Its ok though I always use the South Street Seaport I hate lines and there is never one there.
Videos




