Swing Joined: 7/27/25
https://www.instagram.com/reel/DNBbwN-xzRl/?igsh=MTlseGw0YjIxYWhvbQ==
Updated On: 8/6/25 at 09:32 PMSwing Joined: 7/27/25
$10.9 million comes from the city and $3 million comes from the state. The remaining $10.1 mil comes from Roundabout.
https://playbill.com/article/roundabouts-todd-haimes-theatre-will-undergo-24-million-renovation
“The renovation will expand accessible seating and assisted listening technology, upgrade the digital marquee system, renovate all restrooms and dressing rooms, modernize the elevators, restore the theatre’s historic interior, and upgrade critical building systems. The theatre’s fifth floor will be revamped into a flex-use space to support artistic, education, and community engagement programs.”
Do Studio 54 next and overhaul that mezz!
Swing Joined: 7/27/25
Oh no are they gonna take away the seating on the fifth floor? What’s on the other floors?
ErmengardeStopSniveling said: "Do Studio 54 next and overhaul that mezz!"
A comment on the above instagram post asking about studio 54 got this response: “Don't worry, we're on the same page. One step at a time”
I hope "Haimes" gets a permanent non-digital marquee sign.
Hopefully front row orchestra will have more legroom.
Please do the mezz at Studio 54 next. Maybe the worst mezz to sit in on Broadway (those high backed chairs).
Understudy Joined: 7/5/25
WOW. This is going trio be great. Now, they just have to find a great show.
bwaylyric said: "I hope "Haimes" gets a permanent non-digital marquee sign."
Looks like it does!
Videos